We have the necessary equipment to successfully develop studies and projects in a comprehensive way.BAIRES ING.
We have the necessary equipment to successfully develop studies and projects in a comprehensive way.We made the update of the executive project of widening National Route N° 11 stretch Rotonda de la Virgen - Intersection with National Route N° 81. The total length of the project is about 10 km and it includes 4 bridges of 200 meters.
We inspected the refurbishment of 80 km of Provincial Route N° 126. The jobs consider widening, patching, sealing of cracks, resurfacing and total road reconstruction.
We developed the executive project of basic works, building and paving of National Route N° 259, stretch National Route N° 17-border with Chile. The project total length is about 32 km and it includes 3 bridges.
We made a surface condition evaluation of 200 km/lane of National Route N° 3. We used our high technology equipment which allows us to measure roughness, rutting, bumps and cracks.
We made a survey of concrete paving condition along 216 km of San Miguel Town streets. The information collected by our equipment was then processed by our failure gathering software.
We measured roughness and rutting of West Highway Works I and III with our laser profilometer RSP Mk-III Dynatest. The study was made along 102 km/lane.